One of the first questions manufacturers ask is how many picks per minute a delta robot can achieve. The honest answer is that cycle time depends on more than the robot itself: pick height, product weight, gripper speed and conveyor position all play a role. Still, a simple estimate before purchase can prevent over- or under-sizing.
Throughput is the single number that most buyers use to judge a delta robot, yet it is also the number most often miscalculated. The reason is simple: published cycle times describe an ideal motion, while real lines include gripper time, vision processing and the physics of your specific product. A little upfront arithmetic can save you from buying a robot that is either too slow for your peaks or larger than your line needs.
Start With the Theoretical Cycle
Most suppliers publish a nominal cycle time measured under ideal conditions, typically a 25 mm lift and 305 mm horizontal move. This number gives you a baseline, but real lines run longer paths. As a rule of thumb, doubling the vertical lift adds a meaningful fraction of a second to each cycle, and wider horizontal moves cost more time too.
The nominal cycle time from the datasheet is a useful anchor, but it should never be used as the planning number. It is measured with a short 25 mm lift and a 305 mm horizontal move, with no gripper or product attached. Your real cycle will be longer because the pick height is higher, the travel is farther or the product requires a gentler approach. A reasonable practice is to estimate your real cycle at 1.3 to 1.5 times the nominal value, then refine it with a sample trial.
Add Real-World Penalties
Gripper opening and closing time, vision processing delay and conveyor tracking all add latency. If the theoretical cycle is 0.4 seconds but the gripper needs 0.15 seconds to close, the practical cycle is closer to 0.55 seconds. Calculating this way prevents promising your customers a throughput the cell cannot deliver.
Gripper time is the factor that buyers most often forget. Opening the gripper, closing it, verifying the pick with a sensor and releasing the product all consume time that is not reflected in the robot’s motion cycle. A fast arm can be slowed dramatically by a slow gripper, which is why gripper selection is as much a throughput decision as an engineering one. When you evaluate cells, ask for cycle time including tooling, because that is the number your line will actually experience.
Sizing the Number of Robots
Once you have a realistic cycle time, divide your required hourly output by the cycles per hour to see how many cells you need. At ATOMROBOT, we walk through this calculation with every customer before quoting, because the right number of robots saves far more money than buying one too many or one too few.
Once you have a realistic cycle time, the sizing arithmetic becomes straightforward. Divide the required hourly output by the practical cycles per hour to determine how many cells you need, and always build in margin for peak periods and future growth. At ATOMROBOT, we run this calculation with customers using their product dimensions, path lengths and packaging targets before quoting, so the number of robots recommended matches the production plan rather than a datasheet.
Throughput planning is not complicated, but it must be honest about the conditions on your floor. Start from the real path, add the tooling time and validate with a trial, and you will size the cell correctly. The few hours spent on this analysis protect a much larger investment from being either under-utilized or overwhelmed.
Throughput estimation is not complicated, but it must be honest about real conditions. Run the numbers with your actual product and path, and you will buy exactly the capacity your line needs.